1. Definition & Core Purposes of Pre-Crushing

Pre-crushing (coarse crushing / primary crushing) is the front-end crushing process for bulk calcined petroleum coke / needle coke before fine jet milling, including multi-stage crushing + initial sieving + impurity removal.
Core objectives:

  1. Reduce 50–200 mm bulk coke lumps into uniform small particles, stable feeding for downstream roller mill / jet mill, prevent equipment blockage and uneven grinding load.
  2. Expose wrapped mineral gangue, refractory brick debris and metal foreign bodies for front-end magnetic separation & screening removal.
  3. Shorten subsequent fine grinding time, narrow particle size distribution (PSD), reduce ultra-fine dust generation and control BET surface area.
  4. Create uniform particle gaps for later pitch kneading homogenization, improve pitch coating uniformity and tap density of granulated precursors.

Raw feed: Calcined petroleum coke / needle coke (bulk lump size 50–200 mm, moisture ≤3.0% after calcination cooling).

2. Full Pre-Crushing Process Flow Standard

Raw coke feeding → primary magnetic iron removal → jaw primary coarse crushing → vibrating initial sieving → secondary hammer/roller medium crushing → secondary magnetic separation → secondary sieving → qualified pre-crushed intermediate stock silo
All equipment contact surfaces adopt zirconia ceramic / PU lining to avoid secondary iron contamination.

3. Tiered Particle Size Standard (Critical Technical Index)

3.1 Primary Jaw Coarse Crushing (1st Stage Pre-Crushing)

  • Incoming lump size: 50–200 mm bulk coke
  • Discharge target particle size: All particles ≤10 mm
  • Oversize control standard: Material >10 mm residue on screen ≤2.0% by mass; oversized lumps loop back to jaw crusher for re-crushing
  • Gap adjustment: Jaw discharge gap set 8–12 mm according to raw coke hardness
  • Supporting equipment: Permanent magnetic separator at discharge port to remove steel fragments from calcination furnace lining

3.2 Secondary Medium Crushing (2nd Stage Pre-Crushing, Mandatory for Battery-Grade)

Adopt sealed hammer crusher or double roller crusher after primary sieving to further reduce particle size:

  • Target finished pre-crushed particle size: All particles ≤5 mm (0–5 mm)
  • Optimal main fraction distribution: 1–3 mm accounts for 60–75% of total mass
  • Fine powder control: Fraction <0.5 mm ≤10% (excess fine powder causes high BET after fine milling, low initial Coulombic efficiency)
  • Oversize index: Residue >5 mm after secondary sieving ≤1.0%

3.3 Unified Pre-Crushed Finished Particle Acceptance Standard

Item Industrial Standard for Artificial Graphite Coke Pre-Crushing
Maximum particle size Dmax ≤5 mm
Main particle fraction (1–3 mm) 60–75 wt%
Superfine fraction (<0.5 mm) ≤10 wt%
Oversize (>5 mm) residue rate ≤1.0%
Particle size span uniformity No large lump segregation, uniform grading

4. Equipment Selection & Anti-Contamination Mandatory Requirements

4.1 Standard Pre-Crushing Equipment Matching

  1. Primary crushing: Jaw crusher (all lining plates zirconia / high manganese non-magnetic alloy)
  2. Secondary crushing: Double roller crusher (low dust generation, controllable particle grading) or closed hammer mill (for high-hardness needle coke)
  3. Screening: 10 mesh (2.0 mm) + 5 mesh (4.0 mm) double-layer linear vibrating screen, 316L stainless steel anti-wear mesh
  4. Magnetic separation: Double-stage strong magnetic separator (magnetic field strength ≥12000 Gs) before & after crushing

4.2 Strict Anti-Iron Contamination Rules (Battery-Grade Hard Requirement)

  1. No carbon steel contact liners inside crushing cavity; replace worn metal liners immediately to avoid iron powder mixing into coke.
  2. Two-stage magnetic iron removal:
    • Front feeding magnetic separator: Remove calcination furnace refractory iron scraps, conveying equipment wear debris
    • Post-crushing magnetic separator: Eliminate iron micro-particles generated by crusher liner friction
  3. Control target: Total iron impurity of pre-crushed coke ≤8 ppm before fine milling

5. Raw Material Pre-Conditioning Requirements Before Crushing

5.1 Moisture Control

  • Calcined coke incoming moisture ≤3.0%
  • If moisture >3.0%, equip low-temperature rotary dryer (100–130°C nitrogen hot air) before crushing to eliminate screen mesh blinding and coke agglomeration.
  • Pre-crushed finished material moisture stabilized ≤2.0% before entering homogenization silo.

5.2 Foreign Body Removal Standard

  1. Manual pre-sorting before feeding: Remove refractory brick, plastic, wood, stone gangue mixed in coke lumps.
  2. After two-stage crushing + screening: No visible hard rock, metal blocks, organic foreign bodies in pre-crushed coke.
  3. Foreign body inspection limit: ≤2 visible impurities per 100 kg pre-crushed material.

5.3 Raw Coke Batch Homogenization Before Crushing

Stack multi-batch calcined coke by ash, volatile content, true density; cross-layer reclaiming homogenization ≥12 h to avoid large performance fluctuation of pre-crushed material from different batches.

6. Operation & Process Control Parameters

  1. Feeding speed: Uniform continuous feeding, avoid instantaneous over-feeding causing crusher cavity blockage; install buffer silo + quantitative screw feeder.
  2. Crushing temperature: Closed nitrogen circulation inside crusher to isolate air; material surface temperature ≤150°C to prevent coke surface oxidation.
  3. Circulation re-crushing rule: All oversize particles >5 mm automatically return to secondary roller crusher via belt conveyor closed loop, no manual open circulation.
  4. Sampling frequency: Test particle size distribution every 30 min at secondary screening discharge port; record oversize residue rate, fine powder proportion.

7. Post Pre-Crushing Intermediate Storage Requirements

  1. Sealed nitrogen-blanketed silo storage, internal RH ≤35% to prevent moisture re-absorption.
  2. Pre-crushed coke stored in silo for ≥8 h circulation homogenization to eliminate particle size segregation (large/small particle layering).
  3. Silo discharge magnetic separation again before feeding to jet mill fine grinding station.

8. Common Unqualified Defects & Adjustment Standards

  1. Excess oversize >5 mm (residue >1.0%)
    • Causes: Excessive crusher discharge gap, fast feeding speed, worn screen mesh
    • Solutions: Narrow roller/jaw gap, reduce feeding rate, replace deformed screen cloth
  2. Too much superfine powder <0.5 mm (>10%)
    • Causes: Over-crushing, too small roller gap, long hammer impact time
    • Solutions: Widen secondary roller gap, reduce hammer mill rotation speed
  3. Excess iron impurities (>8 ppm)
    • Causes: Worn metal liners, insufficient magnetic separator magnetic strength
    • Solutions: Replace ceramic lining, upgrade high-strength magnetic separator, increase magnetic separation times
  4. Mesh blinding during screening
    • Causes: Raw coke moisture >3.0%, static agglomeration
    • Solutions: Pre-dry coke, install ultrasonic anti-blocking vibration device on screen

9. Full Pre-Crushing Standard Summary

  1. Two-stage crushing flow: Jaw primary crush (≤10 mm) → roller secondary crush (final Dmax ≤5 mm).
  2. Grading target: 1–3 mm main fraction 60–75%, fine powder <0.5 mm ≤10%, oversize >5 mm ≤1.0%.
  3. Hard quality limits: Fe impurity ≤8 ppm, moisture ≤2.0%, no metal/rock foreign bodies.
  4. Supporting configuration: Double-stage magnetic separation, full non-magnetic ceramic lining, closed nitrogen circulation, automatic oversize loop re-crushing.

Qualified pre-crushed coke with uniform particle grading lays a foundation for narrow PSD fine grinding, stable kneading homogenization and consistent electrochemical performance of finished artificial graphite anode. All pre-crushing system design complies with JACAN full-line low-contamination coke pretreatment standards.

Precision Without the Premium

Get German and Japanese-grade engineering at 1/3 the cost. From free material testing to 24/7 dedicated support, we make top-tier production accessible.
I Need Solutions
JACAN Powder Equipment

More Insights

Explore professional perspectives and technical breakthroughs in ultrafine grinding.

What Is the Impurity Removal Standard of Pitch for Artificial Graphite Anode

Pitch (coal‑tar pitch / petroleum pitch) serves as binder for secondary granulation and carbon‑coating precursor…

How To Filter Pitch For Graphite Anode Jet Milling

Coating‑grade pitch for graphite anode jet milling contains quinoline‑insoluble (QI) hard particles, coke grit, mineral…

How to Dry Pitch for Lithium‑Battery Graphite Anode Coating Agent

Pitch (coal‑tar pitch or petroleum pitch) acts as critical binder and carbon‑coating precursor for artificial…

What Is the Pretreatment Requirement of Pitch for Artificial Graphite Anode Binder

Reference source: graphite‑mill.com technical documentation for artificial graphite anode secondary granulation & carbon‑coating precursor. Pitch…

Chat with us